Sorry if this is already somewhere else, but I searched and couldn't find the exact answer.
I have a Humphrey hea10f5-gl-106w I'm installing in a 2-wayed Tippmann ebolt project. I'm not entirely sure I have the barbs or body to the solenoid mounted in the correct direction. I've seen it done about 3 different ways, and when my noid clicks the ram doesn't move, but is holding pressure.
If someone could tell me the correct way to assemble the body, and what barb locations go to which (i/e lpr, front and rear of ram) it would be much appreciated (including all internals if there is a picture out there, it's been a while since I took one apart but I think I have it correct) If needed I can take pics of mine disassembled and someone can tell me if I did it right.
I think I'm going to put it together like in protege noid, and see if that works. Any help would be appreciated.
Based on the protege lpr:
4 would go to front of the ram
2 to the rear
3 would be LPR (on other side)
Marq noid:
Protege Noid:
From PBgateway: